Coating & Lubrication
Atomized spray for release agents, oil mist and surface treatment lines.
CAPABILITIES
What We Hold for Coating & Lubrication
Droplet band
20–80 µm (air-assisted)
Liquid flow
0.5–200 L/h
Air systems
1–6 bar, 3–30 Nm³/h
Mix types
Internal / external / adjustable
OEM
Built to drawing or sample
Response
Line sizing within one business day
SOLUTION MATRIX
Duties, Nozzles and Parameters We Cover
| Duty | Solution | Parameters | Notes |
|---|---|---|---|
| Mold release agent | AA-20I internal mix | 2–30 L/h, 15–35 µm | Even film, no pooling |
| Oil mist lubrication | AA-20E external mix | 2–40 L/h, 25–60 µm | Independent air/liquid control |
| Heavy oil coating | AA-40E external mix | 15–200 L/h, 35–80 µm | High throughput lines |
| Rust inhibitor spray | AA-20A adjustable | 2–60 L/h, 25–70 µm | On-line tuning |
| Cyclic release duty | AA-20P pneumatically actuated | 2–40 L/h, 25–60 µm | On/off spray control |
| Precision low-flow film | AA-US ultrasonic assisted | 1–20 L/h, 10–30 µm | Finest uniform film |
CHALLENGES WE SOLVE
Where Coating & Lubrication Programs Usually Struggle
Uneven release film sticks parts
Our Solution
Internal-mix atomization for a consistent droplet field across the mold face.
Over-oiling wastes lubricant
Our Solution
External-mix with independent air control. Tune wetness without touching flow.
Line speed changes break coverage
Our Solution
Adjustable and actuated heads that follow the line cycle.
Air cost on continuous runs
Our Solution
Duty-matched mix type. Internal mix uses 2–3× less air than external.
MATERIALS
Materials We Supply for This Duty
316L
Standard coating and lubrication duty
PP / PVDF
Corrosive release chemicals
CAPABILITY & SUPPORT
What Your Program Gets with BoreJet
We work with Molders and casters, Food baking lines, Metal forming plants, Surface treatment lines, with sizing from your numbers, configuration support, samples before the batch, and OEM to drawing.
Send your line speed, coating and target film.
Our engineers reply with the atomizer, air setpoint and configuration, usually within one business day.