BoreJet

Coating & Lubrication

Atomized spray for release agents, oil mist and surface treatment lines.

CAPABILITIES

What We Hold for Coating & Lubrication

Droplet band

20–80 µm (air-assisted)

Liquid flow

0.5–200 L/h

Air systems

1–6 bar, 3–30 Nm³/h

Mix types

Internal / external / adjustable

OEM

Built to drawing or sample

Response

Line sizing within one business day

SOLUTION MATRIX

Duties, Nozzles and Parameters We Cover

DutySolutionParametersNotes
Mold release agentAA-20I internal mix2–30 L/h, 15–35 µmEven film, no pooling
Oil mist lubricationAA-20E external mix2–40 L/h, 25–60 µmIndependent air/liquid control
Heavy oil coatingAA-40E external mix15–200 L/h, 35–80 µmHigh throughput lines
Rust inhibitor sprayAA-20A adjustable2–60 L/h, 25–70 µmOn-line tuning
Cyclic release dutyAA-20P pneumatically actuated2–40 L/h, 25–60 µmOn/off spray control
Precision low-flow filmAA-US ultrasonic assisted1–20 L/h, 10–30 µmFinest uniform film

CHALLENGES WE SOLVE

Where Coating & Lubrication Programs Usually Struggle

Uneven release film sticks parts

Our Solution

Internal-mix atomization for a consistent droplet field across the mold face.

Over-oiling wastes lubricant

Our Solution

External-mix with independent air control. Tune wetness without touching flow.

Line speed changes break coverage

Our Solution

Adjustable and actuated heads that follow the line cycle.

Air cost on continuous runs

Our Solution

Duty-matched mix type. Internal mix uses 2–3× less air than external.

MATERIALS

Materials We Supply for This Duty

316L

Standard coating and lubrication duty

PP / PVDF

Corrosive release chemicals

CAPABILITY & SUPPORT

What Your Program Gets with BoreJet

ISO 8573-1 air quality guidanceDroplet documentationOEM to drawing

We work with Molders and casters, Food baking lines, Metal forming plants, Surface treatment lines, with sizing from your numbers, configuration support, samples before the batch, and OEM to drawing.

Send your line speed, coating and target film.

Our engineers reply with the atomizer, air setpoint and configuration, usually within one business day.